VIEW-IQ / Workspace
Frame Builder
Screen dimensions
Ribs & uprights
Manufacturing
Supports & projector mounts
Optional canopy
Cyan = screen surface, alternating outlines = rib segments, dots = splice joints, squares = uprights, centre dot = eye point.
3D preview
Enclosure · canopy, curtains & roof
Pick a metal frame material to get the track as a metal frame with its own cut list.
Starting values only — not checked for strength, wind, fire safety or full waterproofing. Use flame-retardant blackout fabric.
Cut lists & exports
- 10 × Rib segment — 2,158 × 331 mm, 18 mm sheet, 4 × Ø8.5 mm bolt holes
- 8 × Splice plate — 300 × 153 mm, 18 mm sheet, 4 × Ø8.5 mm bolt holes
- 6 × Canopy panel — 1,810 × 856 mm, 18 mm sheet
- 1 × Test piece — 140 × 90 mm, 18.2 mm slot with Ø6 mm corner cuts, test holes Ø8.3 / 8.5 / 8.7 mm
- 32 × M8 × 50 mm bolt, nut and 2 washers (see Fixings)
- 84 × M8 × 40 mm bolt, nut and 2 washers (see Fixings)
- 14 × M8 × 65 mm bolt, nut and 2 washers (see Fixings)
- 8 × M8 × 60 mm bolt, nut and 2 washers (see Fixings)
- 7 × Upright — 2,200 mm long (timber or extrusion)
Not a structural design: loads, fasteners and material strength are not checked.
Revision 32a93e1f. Cut files include splice bolt holes (BOLT_HOLES layer), the test piece (TEST_PIECE) and its router corner cuts (DOGBONES). Cut the test piece first: the sheet should slide into the slot snugly and a bolt should pass the best-fitting hole. Ribs themselves have no inside corners, so they need no corner cuts. Toolpaths are still set in your CAM software; check the 100 mm reference line after import.
Material & metal cut list
Sign in to upload your own material spec sheets.
Fixings schedule
| Item | Qty | Bolt | Hole | Hole spacing | Bracket | Note |
|---|---|---|---|---|---|---|
| Ribs: Splice joint bolt | 32 | M8 × 50 | Ø8.5 | 150 along × 50 across, 75 from joint | Splice plate 300 × 150 × 18 ply | 4 per joint; matches the cut-file holes. |
| Ribs to uprights: Angle bracket bolt | 56 | M8 × 40 | Ø8.5 | 2 per leg at 50 c/c, 20 from edges | Angle 90 × 90 × 40 × 5 steel | 14 brackets, one per upright per rib level. |
| Legs: Floor anchor | 28 | M8 anchor | Ø8.5 | 4 holes on 160 × 160 square, 20 from edges | Foot plate 200 × 200 × 6 | Anchor type and length depend on your floor — not verified. |
| Legs: Brace end bolt | 14 | M8 × 65 | Ø8.5 | 1 per end on brace centreline | Tab bracket 60 × 40 × 5 | One at the floor rail, one at the upright. |
| Canopy: Arm bracket bolt | 28 | M8 × 40 | Ø8.5 | 2 per bracket at 40 c/c | Angle 60 × 60 × 40 × 5 | 14 brackets: each arm at the top rib and the rear rail. |
| Canopy: Panel fixing | 24 | M8 anchor | Ø8.5 | Corners, 30 from edges, on arm lines | — | Screws into arms; type by fabricator. |
| Projector overhead support: Ceiling anchor | 16 | M8 anchor | Ø8.5 | 4 holes on 100 × 100 square | Ceiling plate 150 × 150 × 8 | Building attachment requires specialist approval — not verified. |
| Projector overhead support: Hanger to frame bolt | 8 | M8 × 60 | Ø8.5 | 2 per hanger at 40 c/c | Angle 60 × 60 × 40 × 5 | Overhead only; never floor-supported. |
Bolts to buy: 32 × M8 × 50 mm, 84 × M8 × 40 mm, 14 × M8 × 65 mm, 8 × M8 × 60 mm.
Bolt lengths = grip + washers + nut + two threads, rounded up to stock lengths. Bracket sizes and edge distances are rule-of-thumb starting values; anchors and building fixings are not chosen. Nothing here is checked for strength. Also included in the metal cut list CSV and the PDF drawings.
Nesting & assembly
8 sheets of 2,440 × 1,220 mm, about 46% of the material used. Curved parts are stacked inside each other with a 10 mm gap (rib segment every 169 mm, splice plate every 160 mm, canopy panel every 790 mm).
- Sheet 1: 6 × Rib segment
- Sheet 2: 4 × Rib segment, 8 × Splice plate, 1 × Test piece
- Sheet 3: 1 × Canopy panel
- Sheet 4: 1 × Canopy panel
- Sheet 5: 1 × Canopy panel
- Sheet 6: 1 × Canopy panel
- Sheet 7: 1 × Canopy panel
- Sheet 8: 1 × Canopy panel
- Cut the test piece first. Check the sheet slides into the slot and pick the bolt hole that fits best; adjust inputs if not.
- Cut 8 sheets from the DXF. Label every part with its sheet number as it comes off.
- Lay out rib segments for each of the 2 levels on the floor, ends touching, following the plan view curve.
- Bolt a splice plate over every joint (8 joints, 4 bolts each, 32 in total).
- Stand the 7 uprights (2200 mm) at the marked positions and fix the bottom rib to them.
- Fix the upper rib level(s), checking the curve against the plan view radius before tightening.
- Screw a 200 mm foot plate under each upright.
- Fit a 781 mm diagonal brace behind each upright, 500 mm out at the floor to 600 mm up the upright.
- Check the frame is level and the curve true, then fit the screen skin.
- Lay the curved canopy panels on their supports with each radial seam aligned to a support arm; secure with fabricator-specified fixings.
- Fit the ceiling-mounted gantry at 2100 mm projector height. No floor supports; building attachments and loads require specialist approval.
The DXF and SVG use this same nested layout. Nesting is by simple stacking, not a full optimiser — CAM nesting software may squeeze in more.