VIEW-IQ / Workspace

Frame Builder

Screen and frame
Screen dimensions
mm
°
mm
mm
mm
mm
Ribs & uprights
mm
Manufacturing
mm
mm
mm
mm
mm
mm
mm
Supports & projector mounts
mm
mm
mm
mm
mm
mm
mm
Optional canopy
mm
Revision 32a93e1f · footprint 6,310 × 3,703 mm · 3 part types. Planning assembly — not structural approval.
Plan view

Cyan = screen surface, alternating outlines = rib segments, dots = splice joints, squares = uprights, centre dot = eye point.

3D preview

Enclosure · canopy, curtains & roof
Curtains and roof
Curtain track8,378 mm round the open back (R3,000), 15 brackets, 5 postsCurtain fabric12 panels × 1,400 mm, cut 2,485 mm long — 29.8 m to buyGliders168 (one per 100 mm of fabric)

Pick a metal frame material to get the track as a metal frame with its own cut list.

Roof6,610 × 6,610 mm, 2,268 mm at the screen falling to 1,922 mm at the backRafters13 × 6,619 mmRoof sheets18 × 2,440 × 1,220 mmRain cover7,210 × 7,219 mm (52.0 m²), 60 eyelets, 6,610 mm gutter at the back

Starting values only — not checked for strength, wind, fire safety or full waterproofing. Use flame-retardant blackout fabric.

Dimensions
Arc length10,472 mmEnd-to-end chord5,909 mmScreen width (true)6,000 mmScreen depth3,521 mmFrame footprint6,310 × 3,703 mmRib radius (inner/outer)3,005 / 3,155 mmSegments per rib5Upright length2,200 mm
Cut lists & exports
Parts list
  • 10 × Rib segment — 2,158 × 331 mm, 18 mm sheet, 4 × Ø8.5 mm bolt holes
  • 8 × Splice plate — 300 × 153 mm, 18 mm sheet, 4 × Ø8.5 mm bolt holes
  • 6 × Canopy panel — 1,810 × 856 mm, 18 mm sheet
  • 1 × Test piece — 140 × 90 mm, 18.2 mm slot with Ø6 mm corner cuts, test holes Ø8.3 / 8.5 / 8.7 mm
  • 32 × M8 × 50 mm bolt, nut and 2 washers (see Fixings)
  • 84 × M8 × 40 mm bolt, nut and 2 washers (see Fixings)
  • 14 × M8 × 65 mm bolt, nut and 2 washers (see Fixings)
  • 8 × M8 × 60 mm bolt, nut and 2 washers (see Fixings)
  • 7 × Upright — 2,200 mm long (timber or extrusion)

Not a structural design: loads, fasteners and material strength are not checked.

Full build report (PDF)

Revision 32a93e1f. Cut files include splice bolt holes (BOLT_HOLES layer), the test piece (TEST_PIECE) and its router corner cuts (DOGBONES). Cut the test piece first: the sheet should slide into the slot snugly and a bolt should pass the best-fitting hole. Ribs themselves have no inside corners, so they need no corner cuts. Toolpaths are still set in your CAM software; check the 100 mm reference line after import.

Material & metal cut list
Metal frame (aluminium or steel)

Sign in to upload your own material spec sheets.

Fixings schedule
Fixings
ItemQtyBoltHoleHole spacingBracketNote
Ribs: Splice joint bolt32M8 × 50Ø8.5150 along × 50 across, 75 from jointSplice plate 300 × 150 × 18 ply4 per joint; matches the cut-file holes.
Ribs to uprights: Angle bracket bolt56M8 × 40Ø8.52 per leg at 50 c/c, 20 from edgesAngle 90 × 90 × 40 × 5 steel14 brackets, one per upright per rib level.
Legs: Floor anchor28M8 anchorØ8.54 holes on 160 × 160 square, 20 from edgesFoot plate 200 × 200 × 6Anchor type and length depend on your floor — not verified.
Legs: Brace end bolt14M8 × 65Ø8.51 per end on brace centrelineTab bracket 60 × 40 × 5One at the floor rail, one at the upright.
Canopy: Arm bracket bolt28M8 × 40Ø8.52 per bracket at 40 c/cAngle 60 × 60 × 40 × 514 brackets: each arm at the top rib and the rear rail.
Canopy: Panel fixing24M8 anchorØ8.5Corners, 30 from edges, on arm lines—Screws into arms; type by fabricator.
Projector overhead support: Ceiling anchor16M8 anchorØ8.54 holes on 100 × 100 squareCeiling plate 150 × 150 × 8Building attachment requires specialist approval — not verified.
Projector overhead support: Hanger to frame bolt8M8 × 60Ø8.52 per hanger at 40 c/cAngle 60 × 60 × 40 × 5Overhead only; never floor-supported.

Bolts to buy: 32 × M8 × 50 mm, 84 × M8 × 40 mm, 14 × M8 × 65 mm, 8 × M8 × 60 mm.

Bolt lengths = grip + washers + nut + two threads, rounded up to stock lengths. Bracket sizes and edge distances are rule-of-thumb starting values; anchors and building fixings are not chosen. Nothing here is checked for strength. Also included in the metal cut list CSV and the PDF drawings.

Nesting & assembly
Nesting and assembly pack

8 sheets of 2,440 × 1,220 mm, about 46% of the material used. Curved parts are stacked inside each other with a 10 mm gap (rib segment every 169 mm, splice plate every 160 mm, canopy panel every 790 mm).

  • Sheet 1: 6 × Rib segment
  • Sheet 2: 4 × Rib segment, 8 × Splice plate, 1 × Test piece
  • Sheet 3: 1 × Canopy panel
  • Sheet 4: 1 × Canopy panel
  • Sheet 5: 1 × Canopy panel
  • Sheet 6: 1 × Canopy panel
  • Sheet 7: 1 × Canopy panel
  • Sheet 8: 1 × Canopy panel
Uprights7 × 2,200 mmJoints8 × splice plate, 4 bolts eachBolts32 for Ø8.5 mm holes, plus washers and nutsCanopy6 panels, 600 mm over the screenLeg braces7 × 781 mm, ends cut at 50.2°Foot plates7 × 200 × 200 mmCeiling gantry1,350 × 450 mm at 2,100 mmPJ1: turn -53.8°, tilt -17.5°, about 2,995 mm to its screen centrePJ2: turn 0.0°, tilt -14.4°, about 3,614 mm to its screen centrePJ3: turn 53.8°, tilt -17.5°, about 2,995 mm to its screen centre
  1. Cut the test piece first. Check the sheet slides into the slot and pick the bolt hole that fits best; adjust inputs if not.
  2. Cut 8 sheets from the DXF. Label every part with its sheet number as it comes off.
  3. Lay out rib segments for each of the 2 levels on the floor, ends touching, following the plan view curve.
  4. Bolt a splice plate over every joint (8 joints, 4 bolts each, 32 in total).
  5. Stand the 7 uprights (2200 mm) at the marked positions and fix the bottom rib to them.
  6. Fix the upper rib level(s), checking the curve against the plan view radius before tightening.
  7. Screw a 200 mm foot plate under each upright.
  8. Fit a 781 mm diagonal brace behind each upright, 500 mm out at the floor to 600 mm up the upright.
  9. Check the frame is level and the curve true, then fit the screen skin.
  10. Lay the curved canopy panels on their supports with each radial seam aligned to a support arm; secure with fabricator-specified fixings.
  11. Fit the ceiling-mounted gantry at 2100 mm projector height. No floor supports; building attachments and loads require specialist approval.

The DXF and SVG use this same nested layout. Nesting is by simple stacking, not a full optimiser — CAM nesting software may squeeze in more.